Ormond

Manchester Metropolitan University is developing this locally listed and historically important campus building to greatly improve facilities and student services while sensitively protecting the significant elements of the existing buildings fabric.

1
Drag
2
Drag
1
Axonometric Overview The intricate facade of the Ormond building was captured by laser scan and built in Revit
2
Interior revealed With the historic facade removed the interventions are revealed
1
Drag
2
Drag
1
Axonometric Overview The intricate facade of the Ormond building was captured by laser scan and built in Revit
2
Interior revealed With the historic facade removed the interventions are revealed

Location:

Manchester

Date:

2016

Type:

University Campus Facility

Client:

Manchester Metropolitan University

Architects:

The Approach

Deploi trained the team members in the use of Revit and assisted in the commissioning of a detailed survey model produced using point cloud technology by accomplished surveyors Maltby. Deploi produced the BIM Execution Plan for the project. Using the Deploi FCBS template the project was converted and developed to capture the design intent and for the production of all drawing deliverables.

Project challenges were primarily associated with the detail of the existing fabric and in particular documenting discrete parts for demolition. However the use of the Revit model and its adaptation to capture proposed design intent enabled the team to achieve their deadlines under an accelerated drawing progamme.

a:PL Project Launch

Project Launch is a hands on workshop style service that ensures a project commences on a firm footing with all key processes established.

a:DSR1 Revit Essentials Training

Essential Revit skills delivered over a 3 day course.

a:d0 Project Briefing Document

When launching a BIM project an effective start up benefits from the early definition of various kinds of information. A well structured PBD can streamline and accelerate this process.

a:D2 BIM Execution Plan

The BIM Execution Plan is prepared to guide and govern the interplay between the members of the design team as they pursue the project and ultimately deliver the information assets at handover. A BEP is a requirement in the application of Level 2 BIM.

a:DA1 Office Revit Template Asset

The Office REVIT template is the key tool for effective project launch, maximising productivity & ensuring consistency. It forms the most valuable investment a business can make in the context of BIM adoption.

a:D1 Office Revit Template Guide

A how-to guide for using Deploi's Template File. The template guide ensures team members understand and capitalise on the benefits of the full range of attributes embedded in the template.

a:DSR2 Office Revit Template Training

The Office Revit Template provides a launch pad for each project that saves time and ensures compliance with office and industry standards.

a:PS Project Support

Deploi offers embedded project support by specialists with exceptional Revit capabilities combined with strong architectural experience.